BMRR--Laying Track Video 70004
laying_track.jpg
After the layout is designed and the benchwork built, the usual place for modelers to move next is to the laying of track. This tape covers many techniques for laying Atlas' Code 83 flex track and turnouts for smooth operation on the Apple Valley Branch. The tape begins with transferring the track plan from paper to the table top or sub-roadbed and laying the roadbed. The tape continues with placement of turnouts, cutting and fitting flex track, installing bridges, and making provisions for separating the layout into sections (also used for modular layouts). Also included is the installation of two types of ground throws for switching the turnouts. Approx. 26 minutes

BMRR--Laying Track Video 70004

$19.95 $15.95 On Sale!