Conrail Cab Ride Mail 3 (Kearny, NJ to Harrisburg, PA)
Green Frog Productions, Ltd., and Neff Video Productions, present this extended version of cab ride Mail 3. The program begins at South Kearny, NJ and ends at Harrisburg Yard. This program was made in cooperation with Consolidated Rail Corporation and was created in early 1998.
Mail 3 (Kearny, NJ to East St. Louis) receives the highest priority and travels over the Passiac and Harismus, Lehigh, Reading, and Harrisburg lines.
Travel by Oak Island Yard, NK tower, over Amtrak's Northeast Corridor and through the Musconetcong tunnel. See trains from PATH, New Jersey Transit, Canadian Pacific and Conrail. Watch the train receive orders from a temporary block station at Sheridan on the Harrisburg Line.
Cover Photos - Captured From Video Re-Mastered from original DV tape masters, Color Correction, Noise reduction, Audio/Video tweaked and UP-Converted to 1080i HD Resolution by Green Frog Productions, Ltd.
2-Disc Set Disc-1 2 hours 7 minutes Disc-2 2 hours 8 minutes Total time Approx. 4 Hours 15 Minutes Dolby Digital 2.0 Stereo On Screen location Graphics Chapter Menus
**This Disc Set Will NOT Play on Regular DVD Players, OR Up-converting DVD Players - BLURAY Disc Players ONLY!** Note: This BLURAY BD-R Disc Set is compatible with the (BLURAY) format, and will play on Most Blu-Ray players in full 1080i HD (including the Sony PlayStation 3 & 4).
This Disc Set has been tested on Numerous BLURAY players for compatibility with the BLURAY Format! You MUST have a (BLURAY) Player to play this video Disc Set!